← Industries/Sector EUWeeks 2–14 · first asset pod live by day 49OfgemFERCNIS2

Energy & UtilitiesGrid · Trading · Assets · Net-Zero

We build AI that holds the lights on. Grid twins, asset-health agents and trading copilots that respect physics, regulation and the energy transition — operating safely inside OT environments.

Unplanned downtime
− 36%
Trading P&L lift
+ £18M / yr
Carbon attribution
100% of dispatch
Flagship pods

The squads we drop in

Asset health
Grid twin
Trading copilot
Net-zero ledger
Deliverables

Everything that ships

  • Asset-health agent
    Predictive maintenance across rotating + fixed assets, with work-order automation.
  • Grid / network twin
    Real-time power-flow twin with what-if dispatch and constraint solving.
  • Trading copilot
    Day-ahead + intraday positions with risk + carbon co-optimisation.
  • Net-zero ledger
    Per-MWh emissions + REGO tracking, audit-grade.
  • OT-safe deployment
    Air-gapped option, IEC 62443 / NIS2 alignment, signed SBOMs.
Pod composition
  • OT/IT Principal
  • Power Systems Engineer
  • ML Engineer (Time Series)
  • Cyber Architect (NIS2 / IEC 62443)
Regulators we ship to
OfgemFERCNIS2IEC 62443
Example output · Twin · dispatch_scenario.jsonjson
{
  "horizon_h": 24,
  "constraints": {
    "n-1": true,
    "voltage": [0.95, 1.05],
    "thermal_limits": "summer"
  },
  "objective": "min(cost) s.t. carbon_intensity < 80gCO2/kWh",
  "result": {
    "cost_gbp": 1842110,
    "co2_g_per_kwh": 74.2,
    "renewables_share": 0.71
  }
}
Timeline

Weeks 2–14 · first asset pod live by day 49

  1. 1
    Weeks 2–5
    OT discovery

    Asset map, OT/IT boundaries, IEC 62443 zones + conduits defined.

  2. 2
    Weeks 5–10
    First pod live

    Asset health or trading copilot in shadow on production telemetry.

  3. 3
    Weeks 10–14
    Twin + ledger

    Network twin + carbon ledger live, signed by Ops + Risk.

FAQs

Things sector leaders ask

Will you deploy inside OT networks?

Yes — air-gapped or one-way data diode options, IEC 62443 zoned, NIS2 aligned, signed SBOMs for every release.

How do you handle dispatch safety?

All dispatch recommendations require human confirmation. The twin runs continuously; humans hold the trigger.

Can you attribute carbon per MWh?

Yes — emissions + REGO attribution per dispatch decision, audit-grade ledger.

Commission · EU Energy & Utilities

Stand up Energy & Utilities in Weeks 2–14.

We'll respond within one business day with a scoping note, a fixed-price outcome contract, and a named principal cleared for your sector. Your details sync straight into our concierge queue.

  • • Outcome-priced — no T&M.
  • • Sovereign by default — your data, your region, your keys.
  • • Regulator-ready dossier shipped with every agent.
By submitting you agree to our outreach for this enquiry. Your details are stored in our governed lead system.